Field Installation
Click here for printable version.Installation
Firestik requires only the positive attachment of power actuated friction fit or mechanical fasteners providing easy installation.
- Select the appropriate profile to accommodate specified deflection of the joint
- Locate Firestik with intumescent facing towards the outer face of wall or wall sheathing
- Attach to overhead in such a manner that the protruding rib of the steel angle is in contact with wall or wall sheathing
- Install adjoining pieces with construction joints of individual pieces (intersecting or aligned) in “butted” contact
- Attachment to flat concrete or bare metal deck use typical 3/4"” power actuated fasteners or concrete anchors a max 24” O/C
- Attachment through a max 1/2"” thick fire proof coating use 1.25” power actuated fasteners or concrete anchors with washers a max 24” O/C
- Metal to metal attachment use min. No. 6 framing screws a max 24” O/C
Manufacturer Recommendations
- When using Firestik with pan deck overhead, install in accordance with specifications of UL or WH approved assemblies providing protection of “flutes” with fire proofing or mineral wool “stuff only”
- Attach Firestik during “top track” or “top sheet” installation
- “Top out” at least one side of wall with Firestik installed prior to MEP installation
- If construction gap occurs at “butted joints” provide additional ambient leakage seal by covering gap with acoustical caulk
Benefits of “Topping Out” rated partitions prior to MEP installation
- Reduce number of unsupported “Field Installation Joints” created to frame around installed penetrations
- Eliminate additional fire taping of “Field Joints”
- Keep integrity of Fire-rated partition, and provide consistent gypsum protection around and above penetrations
- Reduce increased possibility of smoke propagation through additional joints
- Lock framing in place